But if I was paid by the hour, they would have fired me by now.
Yesterday was a prime example. I was putting the cabinet back together, and was confident that all of my water connections were tight and wouldn't leak. But I decided I had better test it before I went any further, and sure enough, there was a leak coming from the base of the faucet. I had to take the sink out again and remove the faucet to fix it. Of course there's no room under there to work, so it's not an easy job. Anyhow, I got it done.
Here's the start to finish...
So now that's done.
I'm installing a few more new cupboard door and cabinet catches today, because some of them are worn and we had some doors fly open on our last trip. And then we're done!
Hopefully tomorrow we can get Igor's exhaust brackets repaired, and then on Wednesday we can head out on our month long trip to the state of Veracruz! Thursday at the latest!
-----------------------------------------------------------------------------------------------------------------------------
Record low deal on this Chefman 6 Quart Air Fryer.And in Canada...






The floor, sink and cabinet look great....good job.
ReplyDeleteWow it looks fantastic! That subfloor was pretty disgusting. Is there an oven/stovetop?
ReplyDelete